Street Resurfacing Schedule

July 2012 thru June 2013
Planned Arterial Resurfacing

These dates and locations may change without notice - April 1, 2013

Location Resurfacing Material

Planned

 100th Street
(from Cactus to Frank Lloyd Wright)
 Repair  Completed
 108th Street
(from Via Linda to Cactus Rd)
 Slurry Seal  Completed
 124th Street
(from Mountain View Rd to Shea Blvd)
 Rubberized
 Hot Mix Asphalt
 Mar 2013
 136th Street
(from Shea Blvd to north of Coyote Rd)
 Conventional Overlay  Completed
 64th Street
(from Shea Blvd to Cactus Rd)
 Conventional Overlay      Jun 2013
 68th Street
(from Roosevelt Rd to McDowell Rd)
 Microseal  Complete
 90th Street
(from south of Via Linda to Mountain View Rd)
  Rubberized
 Hot Mix Asphalt
 Completed
 Doubletree Ranch Rd
(from Scottsdale Rd to Hayden Rd)
 Microseal     Complete
 Dynamite Rd
(from Alma School Rd to 120th St)
 Rubberized
 Hot Mix Asphalt
 Completed
 Goldwater Blvd
(from Indian School Rd to Camelback Rd)
 Microseal  Complete
 Mountain View Rd
(from 92nd St to 96th St)
 Rubberized
 Hot Mix Asphalt
 Completed
 Oak St
(from 56th St to 64th St)
 Conventional Overlay  Completed
 Pinnacle Peak Rd
(from Miller Rd to Pima Rd)
 Rubberized
 Hot Mix Asphalt
  Aug 2013
 Sweetwater Rd
(from 89th St to 96th St)
 Microseal  Completed
 Thomas Road
(from 73rd St to 77th St)
 Rubberized
 Hot Mix Asphalt
 Sep 2013