Regional Transportation Plan - Proposition 400 Projects within Scottsdale
WHAT IS PROPOSITION 400?
Proposition 400 was approved by voters county-wide in November of 2004 to extend a half-cent sales tax to fund major transportation projects throughout Maricopa County. These projects include improvements to freeways and other highways in the state highway system, as well as major arterial streets and intersection improvements. Proposition 400 also funds construction, maintenance and operation of public transit facilities and services.
The City of Scottsdale benefits from Proposition 400 funds that are used to improve Loop 101 (Pima Freeway), and also receives funding for the improvement of several arterial roads and intersections throughout the City.
In addition, Proposition 400 funds are used to fund transit projects such as the construction of a park-and-ride facility and the operation of bus routes and other transit services.
FREEWAY PROJECTS
|
Project Name |
Prop 400 Funds |
Project Status |
| Loop 101 HOV Lanes - Princess Drive to Loop 202 |
$61.8 |
Completed |
| Loop 101 HOV Lanes –Tatum Boulevard (SR51) to Princess Drive |
$18.8 |
Completed |
| Loop 101 and 64th Street interchange |
$31.4 |
Completed |
| Noise Walls at two locations along Loop 101 |
$7.0 |
In Progress |
| Loop 101 new travel lanes - Shea Boulevard to Loop 202 (plus Chaparral Road traffic interchange) |
$97.4 |
Scheduled to start in 2014 |
| Loop 101 new travel lanes - Princess Drive to Shea Boulevard |
$56.4 |
Scheduled to start in 2021 |
| Loop 101 new travel lanes - Scottsdale Road to Princess Drive |
$26.4 |
Scheduled to start in 2022 |
| Total for Freeway Projects |
$299.2 |
ARTERIAL STREET PROJECTS
|
Project Name |
Prop 400 Funds |
Project Status |
|
Pima Road: Loop 101 to Thompson Peak Parkway |
$13.6 |
Completed |
|
Loop 101 North Frontage Road: Scottsdale to Hayden roads |
$3.8 |
Completed |
| Pima Road: Thompson Peak Parkway to Pinnacle Peak Road |
$23.8 |
Complete July 2011 |
| Scottsdale Road: Thompson Peak Parkway to Pinnacle Peak Road |
$11.5 |
Currently in design |
| Pima Road: McDowell Road to Via Linda – a series of five roadway projects to improve Pima Road |
$30.3 |
Via de Ventura to Indian Bend Road completed. Currently, McDowell to Thomas roads in design. |
| Shea Boulevard: Loop 101 to SR 87 – a series of intersection improvements (dedicated right turn lanes, bike lanes, etc.) |
$18.2 |
Intersections of Shea Boulevard at 90th, 92nd, 96th streets, Via Linda, and 134th Street (Mayo) completed. Work on other intersections will continue between 2011 and 2021. |
| Scottsdale Airpark – a series of roadway improvements |
$73.0 |
To be completed between 2011-2026 |
| Pima Road: Pinnacle Peak Road to Stagecoach Pass Road |
$60.3 |
To be completed in different segments between 2013 and 2020. |
| Loop 101 Frontage Roads: Scottsdale Road to Pima/Princess |
$16.1 |
Segment from Scottsdale Road to Hayden Road completed in 2008. Segment from Hayden to Pima/Princess scheduled to begin in 2015. |
| Carefree Highway: Cave Creek Road to Scottsdale Road |
$9.3 |
Construction beginning 2016 |
| Scottsdale Road: Jomax Road to Carefree Highway |
$28.3 |
To be completed between 2016 and 2020 |
| Miller Road underpass at Loop 101 |
$13.9 |
Scheduled to start in 2018 |
| Legacy Drive: Hayden Road to 88th Street |
$13.6 |
Scheduled to start in 2020 |
| Total for Arterial Street Projects |
$315.72 |
TRANSIT PROJECTS
| Transit Service/Facility |
2006 - 2010 Funding |
2011-2026 |
| BUS ROUTES |
| |
| McDowell/McKellips (17) |
$0.0 |
$4.9 |
| Camelback (50) |
$0.4 |
$2.5 |
| Scottsdale/Rural (72) |
$10.3 |
$55.2 |
| Hayden/McClintock (81) |
$0.0 |
$14.9 |
| Peoria Shea (106) |
$1.4 |
$5.8 |
| Bell Rd. (170) |
$0.0 |
$8.5 |
| Scottsdale Express (510) |
$0.1 |
$0.7 |
| Scottsdale Express (512) |
$0.3 |
$1.2 |
| East Loop 101 Connector (511) |
$0.4 |
$5.2 |
| Mesa Express (532) |
$0.0 |
$0.5 |
| Loop 101 Connector (572) Eliminated |
$0.3 |
$0.0 |
| Sub-totals |
$13.2 |
$99.4 |
| OTHER | ||
| Bus Rapid Transit Capital (ROW, facilities) |
$0.0 |
$0.0 |
| Bus Rapid Transit - Operating |
$0.0 |
$7.9 |
| ADA –East Valley Dial-A-Ride, Cab Connection etc. |
$4.9 |
$26.2 |
| General operations (safety, security, fleet maintenance, bus stops) |
$0.3 |
$1.5 |
| Fleet |
$0.8 |
$9.8 |
| Total for ALL Transit Projects |
$19.2 |
$144.8 |