Investing in Our Scottsdale

Image of Capital Improvement Plan
Capital Improvement Plan

Detailed information on each of the city’s capital projects including: project description, cost, geographic location, funding sources, and operating impacts.

Image of Scottsdale Arterial Life Cycle Program Projects
Scottsdale Arterial Life Cycle Program Projects

he projects shown on the map are included in the Maricopa Association of Governments (MAG) Arterial Life Cycle Program (ALCP)

Image of Bond 2019 Projects
Bond 2019 Projects

A list of projects that were approved as part of the 2019 Bond Election.

Construction Project List

Reset Filters

Project Phase

Funding Source

Sponsoring Division

Project Zip Code

  1. 68th Street Bike Lanes

    Completed

    Parks & Recreation

    This project will make a series of improvements to 68th Street between Indian School Road and Thomas Road with the goal of improving safety, connectivity, and the quality of life for residents, students and visitors by completing critical north/south regional bike lanes on this major roadway.

  2. 68th Street Sidewalk - Arizona Canal to Camelback Road

    Design

    Transportation

    The city will construct a 6-foot sidewalk on both sides of 68th Street from the Arizona Canal to just south of Camelback Road. The project will provide a consistent paved sidewalk to improve pedestrian movement and safety along this corridor.

  3. Aquifer Storage and Recovery Wells

    Construction

    Water

    Beginning in the fall of 2020, Scottsdale is constructing four new aquifer storage and recovery wells at strategic locations throughout the city.

  4. Ashler Hills Park

    Construction

    Community Services

    This project will build a 17-Acre neighborhood park at Ashler Hills Drive and 74th Way.

  5. Bike and Pedestrian Studies

    Planning

    Transportation

    The City of Scottsdale wants to hear from you as part of two studies to improve bike and pedestrian connections.

  6. Civic Center Mall Master Plan

    Completed

    Community Services

    On May 1, 2018, the Scottsdale City Council approved a Master Plan for the Civic Center area which lays the groundwork for major and minor repairs to infrastructure, the addition of vital amenities, and provides a road map for future improvements as funding becomes available.

  7. DC Ranch Neighborhood Park

    Planning

    Parks & Recreation

    DC Ranch Neighborhood Park will be built in two phases. Phase one is currently underway and is scheduled to be complete during the spring of 2022. Planning for phase two is just beginning and this portion of the project is not yet funded.

  8. Downtown Splash Pad

    Completed

    Tourism & Events

    Construction work will begin Sept. 30 on a new splash pad near the Marshall Way Bridge in Old Town Scottsdale. The new splash pad will replace the turf area by the fountain closest to Stetson Dr. on the south approach to the Marshall Way Bridge.

  9. Fire Station 606 Renovation

    Design

    Fire

    The City of Scottsdale is making several improvements to Fire Station 606 which is located at the northeast corner of Via Linda and 108th St.

  10. Fire Station 612

    Construction

    Fire

    Design and construct a new 12,000 square foot fire station northwest of the Airpark near the 101 and Hayden Road to improve response times.

  11. Granite Reef Watershed Drainage and Flood Control Improvement

    Construction

    Stormwater & Floodplain Mgmt

    The primary objective of the Granite Reef Watershed Improvement Project is to eliminate the risk of structural flooding, eliminate the Federal Emergency Management Agency (FEMA) floodplain along Granite Reef Wash, and reduce street and yard flooding.